WS Steel Phases 1-3

Owner: WS Steel

Location: Steinbach, MB

Area: Total 65,802

Delivery method: Construction Management, Design-Build

Prime consultant: Wolfrom Engineering Ltd.

Completion date: January 01, 2014

Description:

Three Way Builders was first approached by WS Steel in 2003 for a 31,000 sqft project followed by an addition of 15,700 sqft in 2010.

Later, in 2013, Three Way Builders started Phase 3 with the new addition to the WS Steel Head Office and Manufacturing Plant. This project included a new manufacturing area of 19,102 sqft, with 38’ and 45’ high bays with multiple cranes and specialized pits for more high-tech equipment. The 2-story main building features front offices with a rounded curtain wall while the manufacturing plant has a ceiling height that exceeds 40 feet, along with insulated panel walls, and EPDM roof system.

Back to Projects