Eastman Recycling Plant
Owner: Association for Community Living
Location: Steinbach, MB
Area: 10,000
Delivery method: Tendered
Prime consultant: Northern Sky Architecture Inc.
Completion date: October 01, 2017
Description:
Back in 2005, Three Way Builders was awarded this job to build the 10,000 sq.ft. Recycling Plant in Steinbach, MB. Then in 2017, after the building suffered some fire damage, we came back to fix the metal panels on the south side of the building as well as the overhead door opening.