Barkman Concrete Paver Plant
Owner: Barkman Concrete Ltd.
Location: Steinbach, MB
Area: 40,818
Delivery method: Design-Build
Prime consultant: J.R. Wagner Architect Inc.
Completion date: October 01, 2014
Three Way Builders was awarded this project to construct a 40,818 square foot Paver Plant for Barkman Concrete at their 152 Brandt Street location in Steinbach, Manitoba. This new building features specialized, modern, computer-driven equipment for better and faster production to keep up with Barkman’s demand for these products. The plant is structured with a concrete foundation and Robertson Steel pre-engineered steel building system, featuring a height of 57 feet. Coordination with three structural engineers was required: foundation, pre-engineered building, and vibration control.