Brant Street Automated Carwash
June 22, 2017
Providence University College Student Services
August 25, 2016
Show all

Bothwell Cheese – Additions

Owner:

Bothwell Cheese

Location:

Bothwell, MB

Area/Size:

645 - Silo Link, 2,475 Water Treatment

Delivery Method:

Design-Build

Prime Consultant:

Beach Rocke Engineering Ltd.

Completion Date:

May 2017

Description:

Three Way Builders was hired to design-build a link to the existing facility and add some large concrete pads for new silos. This project also included the installation of those silos, which have a fair amount of piping that was installed into the new link area.