Ste. Anne Co-op Bulk Petroleum Station:

- This pre-engineered building includes special features such as four hour fire wall between the office and warehouse, necessary to accommodate the storage of high hazard products.
Description:
Three Way Builders designed and built the efficient pre-engineered steel building to meet the specific needs of Ste. Anne Co-op Ltd. – within a set five month construction schedule. Due to the storage of potentially hazardous products, four hour fire-walls were required between office and warehouse, and the building had to be accessible 24 hours per day to truckers loading fuel. Building features included a high-ceilinged show room, in-floor heating pipes for employee comfort, and shop walls and ceilings lined with pre-finished metal.
Statistics:
| Owner: | Ste. Anne Co-op Ltd. |
| Method: | Design-Build |
| Total Area: | 11,500 sq. ft. (1068 m²) |
| Design: | February 1998 to April 1998 |
| Construction: | April 16, 1998 to September 17, 1998 |
| Comments: | Special regulatory compliance met. Occupancy on schedule. |