Recreational

Current Projects

Project Photos:

North Centennial Pool Addition:

North Centennial Pool Addition

Artist's rendering of the proposed addition to the North Centennial Pool at 90 Sinclair Street in Winnipeg.

Description:

Three Way Builders is working with Bridgman Collaborative Architecture on this design/build project for the City of Winnipeg. The project includes an 18,000 sqft addition to provide space for a new gym, classrooms, kitchens, and a fitness centre. Additionally, the scope of work also includes renovating the existing shower and washroom areas and installing a sprinkler system in the entire facility.

To attain the LEED Silver Certification in environmental design, this building will incorporate numerous “green” features including 8,000 sqft of green roof areas and a large solar wall system.

Statistics:

Owner: City of Winnipeg
Method: Design/Build
Total Addition Area: 23, 000 sq. ft.
Design: Bridgman Collaborative Architecture
Start Design: January 5, 2009
Start Construction: April 6, 2009
Projected Completion: March 31, 2010
 
 
 
 
 
Dream.  Design.  Build.