Automotive & Implement

Completed Projects

Project Photos:

Funk’s Auto Body:

Funk's Auto Body
This facility has all the high-tech tools needed for automotive frame and body repairs.

Description:

The owner’s requirements were to have a facility that would set new industry standards for auto body precision and shop technicians’ comfort. Design parameters for a dust-free environment, with a warm floor and bright lighting levels were important. Three Way Builders Ltd. utilized a concrete floor with in-floor heating pipes, and applied surface hardeners and scalers for durability. Under-floor ventilation and airflow pits were installed under the two paint booths.

The economical pre-engineered steel superstructure features full pre-finished metal liners on the walls and ceiling for ease of cleaning. Extra precautions were taken to ensure a dust-free office, including separate air distribution and the construction of an air-tight demising wall.

Statistics:

Owner: Clem Chaput
Method: Design-Build, Contract
Total Area: 10,800 sq.ft. (1003 m²)
Design: September 1998 to October 1998
Construction: November 4, 1998 to May 21, 1999
Comments: A functional and attractive facility.
 
 
 
 
 
Dream.  Design.  Build.