<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Three Way Builders Ltd. &#187; Recreational</title>
	<atom:link href="http://threewaybuilders.com/category/projects/recreational/feed" rel="self" type="application/rss+xml" />
	<link>http://threewaybuilders.com</link>
	<description>Dream.  Design.  Build.</description>
	<lastBuildDate>Tue, 06 Dec 2011 23:56:11 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.2.1</generator>
		<item>
		<title>Motel 6</title>
		<link>http://threewaybuilders.com/projects/motel-6</link>
		<comments>http://threewaybuilders.com/projects/motel-6#comments</comments>
		<pubDate>Mon, 11 Oct 2010 04:49:21 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Multi Family Housing]]></category>
		<category><![CDATA[Office & Retail]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Recreational]]></category>
		<category><![CDATA[Completed Projects]]></category>

		<guid isPermaLink="false">http://threewaybuilders.com/?p=612</guid>
		<description><![CDATA[<p><strong>Owner: </strong> Schinkel Hospitality Group<br />
<strong>Method: </strong>Construction Management<br />
<strong>Total Area: </strong>30,000 sq. ft.<br />
<strong>Design: </strong> Denis Gerald Rioux Architect<br />
<strong>Construction Start: </strong>August 2010<br />
<strong>Projected Completion: </strong>May 2011</p>
]]></description>
			<content:encoded><![CDATA[<h5>Project Photos:</h5>

<div class="ngg-galleryoverview" id="ngg-gallery-75-612">


	
	<!-- Thumbnails -->
		
	<div id="ngg-image-453" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/motel6/a_motel6_site.jpg" title="Motel 6 - site" class="thickbox" rel="set_75" >
								<img title="Motel 6 - site" alt="Motel 6 - site" src="http://threewaybuilders.com/wp-content/gallery/motel6/thumbs/thumbs_a_motel6_site.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-454" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/motel6/b_motel6_basement_and_pool_grade_beam.jpg" title="Motel 6 - basement and pool grade beam" class="thickbox" rel="set_75" >
								<img title="Motel 6 - basement and pool grade beam" alt="Motel 6 - basement and pool grade beam" src="http://threewaybuilders.com/wp-content/gallery/motel6/thumbs/thumbs_b_motel6_basement_and_pool_grade_beam.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-455" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/motel6/c_motel6_basement.jpg" title="Motel 6 - basement construction" class="thickbox" rel="set_75" >
								<img title="Motel 6 - basement construction" alt="Motel 6 - basement construction" src="http://threewaybuilders.com/wp-content/gallery/motel6/thumbs/thumbs_c_motel6_basement.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-466" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/motel6/motel-6-april-25-011.jpg" title="Motel 6 - Interior - Dec. 2011" class="thickbox" rel="set_75" >
								<img title="Motel 6 - Interior - Dec. 2011" alt="Motel 6 - Interior - Dec. 2011" src="http://threewaybuilders.com/wp-content/gallery/motel6/thumbs/thumbs_motel-6-april-25-011.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-467" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/motel6/motel-6-cafeteria.jpg" title="Motel 6 - Cafeteria - Dec. 2011" class="thickbox" rel="set_75" >
								<img title="Motel 6 - Cafeteria - Dec. 2011" alt="Motel 6 - Cafeteria - Dec. 2011" src="http://threewaybuilders.com/wp-content/gallery/motel6/thumbs/thumbs_motel-6-cafeteria.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-468" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/motel6/motel-6-field-view.jpg" title="Motel 6 - Exterior - Dec. 2011 (A)" class="thickbox" rel="set_75" >
								<img title="Motel 6 - Exterior - Dec. 2011 (A)" alt="Motel 6 - Exterior - Dec. 2011 (A)" src="http://threewaybuilders.com/wp-content/gallery/motel6/thumbs/thumbs_motel-6-field-view.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-469" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/motel6/motel-6-street-view.jpg" title="Motel 6 - Exterior - Dec. 2011 (B)" class="thickbox" rel="set_75" >
								<img title="Motel 6 - Exterior - Dec. 2011 (B)" alt="Motel 6 - Exterior - Dec. 2011 (B)" src="http://threewaybuilders.com/wp-content/gallery/motel6/thumbs/thumbs_motel-6-street-view.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 	 	
	<!-- Pagination -->
 	<div class="ngg-clear"></div> 	
</div>


<h4>Motel 6:</h4>
<dl id="attachment_639" class="wp-caption alignnone" style="width: 354px"><dt><img class="size-full wp-image-639" title="Motel 6 - Basement" src="http://threewaybuilders.com/wp-content/uploads/2010/10/Motel6_basement_small.jpg" alt="Motel 6 - Basement" width="350" height="252" /></dt><dd class="wp-caption-text" style="width:330px">Photo: Basement Construction.  The 70 unit motel will feature a swimming pool.</dd></dl>
<h4>Description:</h4>
<p>In spring of 2011, a new Motel 6 will open on the TransCanada Highway in Headingly.  Three Way Builders is pleased to be part of the team that is opening up a whole new option for travellers going to and from Winnipeg.  The 70 unit motel will feature a swimming pool that will attract families coming for events in the nearby John Blumberg Sports Complex and the newly constructed MTS Multiplex.  This new Motel 6 will feature the brand new corporate image and should attract more businesses and travellers to the area.</p>
]]></content:encoded>
			<wfw:commentRss>http://threewaybuilders.com/projects/motel-6/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Sturgeon Heights Community Centre</title>
		<link>http://threewaybuilders.com/projects/sturgeon-heights-community-centre</link>
		<comments>http://threewaybuilders.com/projects/sturgeon-heights-community-centre#comments</comments>
		<pubDate>Tue, 05 Oct 2010 22:43:14 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Health & Institutional]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Recreational]]></category>
		<category><![CDATA[Current Projects]]></category>

		<guid isPermaLink="false">http://threewaybuilders.com/?p=581</guid>
		<description><![CDATA[<p><strong>Owner: </strong> City of Winnipeg<br />
<strong>Method:</strong> Construction Management<br />
<strong>Total Area:</strong> 16,000 sq. ft.<br />
<strong>Design:</strong> Prairie Architects Inc.<br />
<strong>Construction Start:</strong> September 2010<br />
<strong>Projected Completion:</strong> May 2010</p>
]]></description>
			<content:encoded><![CDATA[<h3>Sturgeon Heights Community Centre</h3>
<dl id="460" class="wp-caption alignnone" style="width: 594px"><dt><img src="http://threewaybuilders.com/wp-content/gallery/cache/460__590x295_sturgeonheightsprojectsign-buildingsections.gif" alt="Sturgeon Heights - Building Sections" title="Sturgeon Heights - Building Sections"  /></dt><dd class="wp-caption-text" style="width:570px">The fabulous new facility will replace the existing aging building.</dd></dl>
<h5>Photos:</h5>

<div class="ngg-galleryoverview" id="ngg-gallery-67-581">


	
	<!-- Thumbnails -->
		
	<div id="ngg-image-460" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/sturgeonheights/sturgeonheightsprojectsign-buildingsections.gif" title="Sturgeon Heights - Building Sections" class="thickbox" rel="set_67" >
								<img title="Sturgeon Heights - Building Sections" alt="Sturgeon Heights - Building Sections" src="http://threewaybuilders.com/wp-content/gallery/sturgeonheights/thumbs/thumbs_sturgeonheightsprojectsign-buildingsections.gif" width="66" height="49" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-459" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/sturgeonheights/sturgeonheights-floorplan.jpg" title="Sturgeon Heights - Floor Plan" class="thickbox" rel="set_67" >
								<img title="Sturgeon Heights - Floor Plan" alt="Sturgeon Heights - Floor Plan" src="http://threewaybuilders.com/wp-content/gallery/sturgeonheights/thumbs/thumbs_sturgeonheights-floorplan.jpg" width="66" height="49" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-456" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/sturgeonheights/a_sturgeon_heights_front_07oct2010.jpg" title="The existing Sturgeon Heights Community Centre that will be replaced with a new Facility." class="thickbox" rel="set_67" >
								<img title="Sturgeon Heights - Front" alt="Sturgeon Heights - Front" src="http://threewaybuilders.com/wp-content/gallery/sturgeonheights/thumbs/thumbs_a_sturgeon_heights_front_07oct2010.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-457" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/sturgeonheights/b_sturgeon_heights_back_07oct2010.jpg" title="Both of these buildings will be removed to make room for a new parking lot in front of the new building." class="thickbox" rel="set_67" >
								<img title="Sturgeon Heights - Back" alt="Sturgeon Heights - Back" src="http://threewaybuilders.com/wp-content/gallery/sturgeonheights/thumbs/thumbs_b_sturgeon_heights_back_07oct2010.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-458" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/sturgeonheights/c_sturgeon_heights_driving_and_concrete_piles_07oct2010.jpg" title="Driving and concrete piles" class="thickbox" rel="set_67" >
								<img title="Sturgeon Heights - Work Begins" alt="Sturgeon Heights - Work Begins" src="http://threewaybuilders.com/wp-content/gallery/sturgeonheights/thumbs/thumbs_c_sturgeon_heights_driving_and_concrete_piles_07oct2010.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-410" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/sturgeonheights/c_sturgeonheights_contaminationpreventionscreening_1.jpg" title="Sturgeon Heights - Contamination Prevention Screening 1" class="thickbox" rel="set_67" >
								<img title="Sturgeon Heights - Contamination Prevention Screening" alt="Sturgeon Heights - Contamination Prevention Screening" src="http://threewaybuilders.com/wp-content/gallery/sturgeonheights/thumbs/thumbs_c_sturgeonheights_contaminationpreventionscreening_1.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-470" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/sturgeonheights/sturgeon-heights-exterior-dec-2011-a.jpg" title="Sturgeon Heights - exterior Dec. 2011 (A)" class="thickbox" rel="set_67" >
								<img title="sturgeon-heights-exterior-dec-2011-a" alt="sturgeon-heights-exterior-dec-2011-a" src="http://threewaybuilders.com/wp-content/gallery/sturgeonheights/thumbs/thumbs_sturgeon-heights-exterior-dec-2011-a.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-471" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/sturgeonheights/sturgeon-heights-exterior-dec-2011-b.jpg" title="Sturgeon Heights - exterior Dec. 2011 (B)" class="thickbox" rel="set_67" >
								<img title="sturgeon-heights-exterior-dec-2011-b" alt="sturgeon-heights-exterior-dec-2011-b" src="http://threewaybuilders.com/wp-content/gallery/sturgeonheights/thumbs/thumbs_sturgeon-heights-exterior-dec-2011-b.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 	 	
	<!-- Pagination -->
 	<div class="ngg-clear"></div> 	
</div>


<h4>Description:</h4>
<p>After completing the Design/Build project at the North Centennial Recreation Centre on Sinclair Street, TWB was successful in the Construction Management tender for the Sturgeon Heights Community Centre on Rita Street.</p>
<p>This fabulous new facility will replace the existing aging building on this site and provide a great gathering place for the local community.</p>
<p>Construction is underway and we are looking forward to a successful project that will provide a great recreational and gathering space for many years to come.</p>
]]></content:encoded>
			<wfw:commentRss>http://threewaybuilders.com/projects/sturgeon-heights-community-centre/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>North Centennial Pool Addition</title>
		<link>http://threewaybuilders.com/projects/north-centennial-pool-addition</link>
		<comments>http://threewaybuilders.com/projects/north-centennial-pool-addition#comments</comments>
		<pubDate>Mon, 06 Apr 2009 17:38:36 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Recreational]]></category>
		<category><![CDATA[Completed Projects]]></category>

		<guid isPermaLink="false">http://threeway.aircraftadmin.ca/?p=161</guid>
		<description><![CDATA[<table style="width: 350px;" border="0" cellpadding="0" align="left">
<tbody>
<tr>
<td width="140" align="left">Owner:</td>
<td align="left">City of Winnipeg</td>
</tr>
<tr>
<td width="140" align="left">Method:</td>
<td align="left">Design/Build</td>
</tr>
<tr>
<td width="140" align="left">Total Addition Area:</td>
<td align="left">23, 000 sq. ft.</td>
</tr>
<tr>
<td width="140" align="left">Design:</td>
<td align="left">Bridgman Collaborative Architecture</td>
</tr>
<tr>
<td width="140" align="left">Start Design:</td>
<td align="left">January 5, 2009</td>
</tr>
<tr>
<td width="140" align="left">Start Construction:</td>
<td align="left">April 6, 2009</td>
</tr>
<tr>
<td width="140" align="left">Projected Completion:</td>
<td align="left">March 31, 2010</td>
</tr>
</tbody>
</table>
]]></description>
			<content:encoded><![CDATA[<h5>Project Photos:</h5>

<div class="ngg-galleryoverview" id="ngg-gallery-40-161">


	
	<!-- Thumbnails -->
		
	<div id="ngg-image-240" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/northcent01.jpg" title="Artist's rendering of the proposed addition to the North Centennial Pool at 90 Sinclair Street in Winnipeg. " class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_northcent01.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-241" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/northcent02.jpg" title="Artist's rendering of the proposed facility." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_northcent02.jpg" width="65" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-242" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/northcent03.jpg" title="Artist's interior rendering of the proposed main lobby area." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_northcent03.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-243" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/northcent04.jpg" title="A scale model was used to study the mass elements and roof components of this structure." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_northcent04.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-244" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/northcent05.jpg" title="June 23, 2009, the sod turning was capably completed by Doug Martindale, MLA for Burrows, His Worship, Winnipeg Mayor Sam Katz, and Mike Pagtakhan, Councillor for Pt. Douglas Ward." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_northcent05.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-245" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/northcent06.jpg" title="The first job on site was the demolition of the existing building entrance canopy." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_northcent06.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-246" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/northcent07.jpg" title="All the concrete piles were done by July 7th." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_northcent07.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-247" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/northcent08.jpg" title="The entire addition is a structural concrete floor. This photo shows the 11 1/2&quot; styrospan void form below." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_northcent08.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-248" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/northcent09.jpg" title="After a full week of rain delays, the gym floor was poured on August 4th." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_northcent09.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-397" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/01-northsideoffacility-notethelargegreenroofarea.jpg" title="North Side of Facility.  Note the large green roof area." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_01-northsideoffacility-notethelargegreenroofarea.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-398" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/02-thissouthsidehas_a_greenroofand_a_slopedsolarwall.jpg" title="This south side has a green roof and a sloped solar wall." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_02-thissouthsidehas_a_greenroofand_a_slopedsolarwall.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-399" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/03-insidethegymnasium.jpg" title="Inside the gymnasium." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_03-insidethegymnasium.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-400" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/04-fillingthepoolafterthenewtileswereinstalled.jpg" title="Filling the pool after the new tiles were installed." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_04-fillingthepoolafterthenewtileswereinstalled.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 	 	
	<!-- Pagination -->
 	<div class="ngg-clear"></div> 	
</div>


<h4>North Centennial Pool Addition:</h4>
<dl class="wp-caption alignnone" style="width: 354px"><dt><img class="ngg-singlepic ngg-none" title="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/northcent01.jpg" alt="North Centennial Pool Addition" width="350" height="250" /></dt><dd class="wp-caption-text" style="width:330px">Artist&#39;s rendering of the proposed addition to the North Centennial Pool at 90 Sinclair Street in Winnipeg. </dd></dl>
<h4>Description:</h4>
<p>Three Way Builders is working with Bridgman Collaborative Architecture on this design/build project for the City of Winnipeg. The project includes an 18,000 sqft addition to provide space for a new gym, classrooms, kitchens, and a fitness centre. Additionally, the scope of work also includes renovating the existing shower and washroom areas and installing a sprinkler system in the entire facility.</p>
<p>To attain the LEED Silver Certification in environmental design, this building will incorporate numerous &#8220;green&#8221; features including 8,000 sqft of green roof areas and a large solar wall system.</p>
]]></content:encoded>
			<wfw:commentRss>http://threewaybuilders.com/projects/north-centennial-pool-addition/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>White Bear Arena Renovation</title>
		<link>http://threewaybuilders.com/projects/white-bear-arena-renovation</link>
		<comments>http://threewaybuilders.com/projects/white-bear-arena-renovation#comments</comments>
		<pubDate>Mon, 02 Oct 2000 22:13:17 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Recreational]]></category>
		<category><![CDATA[Completed Projects]]></category>

		<guid isPermaLink="false">http://threeway.aircraftadmin.ca/?p=49</guid>
		<description><![CDATA[<table style="width: 100%;" border="0" cellpadding="0" align="left">
<tbody>
<tr>
<td width="90" align="left">Owner:</td>
<td align="left">White Bear First Nation</td>
</tr>
<tr>
<td width="90" align="left">Method:</td>
<td align="left">Design-Build</td>
</tr>
<tr>
<td width="90" align="left">Total Area:</td>
<td align="left">28,190 sq. ft. (2619 m²)</td>
</tr>
<tr>
<td width="90" align="left">Design:</td>
<td align="left">Owner's representatives, Three Way Builders Ltd., L.L. Riding Engineering</td>
</tr>
<tr>
<td width="90" align="left">Construction:</td>
<td align="left">October 2000 to January 2001</td>
</tr>
</tbody>
</table>]]></description>
			<content:encoded><![CDATA[<h5>Project Photos:</h5>

<div class="ngg-galleryoverview" id="ngg-gallery-1-49">


	
	<!-- Thumbnails -->
		
	<div id="ngg-image-20" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/white-bear-arena-renovation/whitebear01.jpg" title="New exterior pre-finished cladding was applied to all walls and roof surfaces, resulting in a structure which literally &amp;quot;looks like new.&amp;quot;" class="thickbox" rel="set_1" >
								<img title="White Bear Arena Renovation" alt="White Bear Arena Renovation" src="http://threewaybuilders.com/wp-content/gallery/white-bear-arena-renovation/thumbs/thumbs_whitebear01.jpg" width="65" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-2" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/white-bear-arena-renovation/whitebear02.jpg" title="The reconstructed viewing area has an excellent, heated view of the ice surface below." class="thickbox" rel="set_1" >
								<img title="The reconstructed viewing area has ..." alt="The reconstructed viewing area has ..." src="http://threewaybuilders.com/wp-content/gallery/white-bear-arena-renovation/thumbs/thumbs_whitebear02.jpg" width="65" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-3" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/white-bear-arena-renovation/whitebear03.jpg" title="Although the existing arena&amp;#039;s original laminated wood trusses were structurally sound, new joists were added to each existing joist for reinforcement between the trusses." class="thickbox" rel="set_1" >
								<img title="Although the existing arena&amp;#039;s original ..." alt="Although the existing arena&amp;#039;s original ..." src="http://threewaybuilders.com/wp-content/gallery/white-bear-arena-renovation/thumbs/thumbs_whitebear03.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-4" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/white-bear-arena-renovation/whitebear04.jpg" title="The raised heated viewing area is directly behind the players benches." class="thickbox" rel="set_1" >
								<img title="The raised heated viewing area is ..." alt="The raised heated viewing area is ..." src="http://threewaybuilders.com/wp-content/gallery/white-bear-arena-renovation/thumbs/thumbs_whitebear04.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-5" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/white-bear-arena-renovation/whitebear05.jpg" title="After removing the existing siding." class="thickbox" rel="set_1" >
								<img title="After removing the existing siding ..." alt="After removing the existing siding ..." src="http://threewaybuilders.com/wp-content/gallery/white-bear-arena-renovation/thumbs/thumbs_whitebear05.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 	 	
	<!-- Pagination -->
 	<div class="ngg-clear"></div> 	
</div>


<h4>White Bear Arena Renovation:</h4>
<dl id="attachment_53" class="wp-caption alignnone" style="width: 354px"><dt><a title="Large Photo: White Bear Arena Renovation" href="http://threewaybuilders.com/uncategorized/large-photo-white-bear-arena-renovation"><img class="size-full wp-image-53  " title="White Bear Arena Renovation" src="http://threewaybuilders.com/wp-content/uploads/2010/01/whitebear01.jpg" alt="" width="350" height="263" /></a></dt><dd class="wp-caption-text" style="width:330px">New exterior pre-finished cladding was applied to all walls and roof surfaces, resulting in a structure which literally &quot;looks like new.&quot;</dd></dl>
<h4>Description:</h4>
<p>This renovation of the existing arena in White Bear, Saskatchewan involved several distinct challenges. The main structure&#8217;s laminated wood roof trusses were structurally sound, but all of the joists between them needed to be replaced. The worn wooden bleachers needed repairs and painting, and although the in-floor cooling pipes were serviceable, the ice plant needed reconditioning.</p>
<p>We began by gutting the public viewing areas, then completely rebuilt the arena with new framing, block-work, electrical and mechanical fixtures and new finishes. Finally, we installed new exterior pre-finished cladding on the entire building. The end result is a first-rate arena at a fraction of what a new arena would have cost.</p>
]]></content:encoded>
			<wfw:commentRss>http://threewaybuilders.com/projects/white-bear-arena-renovation/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

