<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Three Way Builders Ltd. &#187; Recreational</title>
	<atom:link href="http://threewaybuilders.com/category/projects/recreational/feed" rel="self" type="application/rss+xml" />
	<link>http://threewaybuilders.com</link>
	<description>Dream.  Design.  Build.</description>
	<lastBuildDate>Thu, 06 May 2010 20:56:22 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>North Centennial Pool Addition</title>
		<link>http://threewaybuilders.com/projects/north-centennial-pool-addition</link>
		<comments>http://threewaybuilders.com/projects/north-centennial-pool-addition#comments</comments>
		<pubDate>Mon, 06 Apr 2009 17:38:36 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Recreational]]></category>
		<category><![CDATA[Current Projects]]></category>

		<guid isPermaLink="false">http://threeway.aircraftadmin.ca/?p=161</guid>
		<description><![CDATA[<table style="width: 350px;" border="0" cellpadding="0" align="left">
<tbody>
<tr>
<td width="140" align="left">Owner:</td>
<td align="left">City of Winnipeg</td>
</tr>
<tr>
<td width="140" align="left">Method:</td>
<td align="left">Design/Build</td>
</tr>
<tr>
<td width="140" align="left">Total Addition Area:</td>
<td align="left">23, 000 sq. ft.</td>
</tr>
<tr>
<td width="140" align="left">Design:</td>
<td align="left">Bridgman Collaborative Architecture</td>
</tr>
<tr>
<td width="140" align="left">Start Design:</td>
<td align="left">January 5, 2009</td>
</tr>
<tr>
<td width="140" align="left">Start Construction:</td>
<td align="left">April 6, 2009</td>
</tr>
<tr>
<td width="140" align="left">Projected Completion:</td>
<td align="left">March 31, 2010</td>
</tr>
</tbody>
</table>]]></description>
			<content:encoded><![CDATA[<h5>Project Photos:</h5>

<div class="ngg-galleryoverview" id="ngg-gallery-40-161">


	
	<!-- Thumbnails -->
		
	<div id="ngg-image-240" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/northcent01.jpg" title="Artist's rendering of the proposed addition to the North Centennial Pool at 90 Sinclair Street in Winnipeg. " class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_northcent01.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-241" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/northcent02.jpg" title="Artist's rendering of the proposed facility." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_northcent02.jpg" width="65" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-242" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/northcent03.jpg" title="Artist's interior rendering of the proposed main lobby area." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_northcent03.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-243" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/northcent04.jpg" title="A scale model was used to study the mass elements and roof components of this structure." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_northcent04.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-244" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/northcent05.jpg" title="June 23, 2009, the sod turning was capably completed by Doug Martindale, MLA for Burrows, His Worship, Winnipeg Mayor Sam Katz, and Mike Pagtakhan, Councillor for Pt. Douglas Ward." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_northcent05.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-245" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/northcent06.jpg" title="The first job on site was the demolition of the existing building entrance canopy." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_northcent06.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-246" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/northcent07.jpg" title="All the concrete piles were done by July 7th." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_northcent07.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-247" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/northcent08.jpg" title="The entire addition is a structural concrete floor. This photo shows the 11 1/2&quot; styrospan void form below." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_northcent08.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-248" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/northcent09.jpg" title="After a full week of rain delays, the gym floor was poured on August 4th." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_northcent09.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-397" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/01-northsideoffacility-notethelargegreenroofarea.jpg" title="North Side of Facility.  Note the large green roof area." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_01-northsideoffacility-notethelargegreenroofarea.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-398" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/02-thissouthsidehas_a_greenroofand_a_slopedsolarwall.jpg" title="This south side has a green roof and a sloped solar wall." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_02-thissouthsidehas_a_greenroofand_a_slopedsolarwall.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-399" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/03-insidethegymnasium.jpg" title="Inside the gymnasium." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_03-insidethegymnasium.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-400" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/04-fillingthepoolafterthenewtileswereinstalled.jpg" title="Filling the pool after the new tiles were installed." class="thickbox" rel="set_40" >
								<img title="North Centennial Pool Addition" alt="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/thumbs/thumbs_04-fillingthepoolafterthenewtileswereinstalled.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 	 	
	<!-- Pagination -->
 	<div class="ngg-clear"></div> 	
</div>


<h4>North Centennial Pool Addition:</h4>
<div class="wp-caption alignnone" style="width: 354px"><img class="ngg-singlepic ngg-none" title="North Centennial Pool Addition" src="http://threewaybuilders.com/wp-content/gallery/north-centennial-pool-addition/northcent01.jpg" alt="North Centennial Pool Addition" width="350" height="250" /><p class="wp-caption-text">Artist&#39;s rendering of the proposed addition to the North Centennial Pool at 90 Sinclair Street in Winnipeg. </p></div>
<h4>Description:</h4>
<p>Three Way Builders is working with Bridgman Collaborative Architecture on this design/build project for the City of Winnipeg. The project includes an 18,000 sqft addition to provide space for a new gym, classrooms, kitchens, and a fitness centre. Additionally, the scope of work also includes renovating the existing shower and washroom areas and installing a sprinkler system in the entire facility.</p>
<p>To attain the LEED Silver Certification in environmental design, this building will incorporate numerous &#8220;green&#8221; features including 8,000 sqft of green roof areas and a large solar wall system.</p>
]]></content:encoded>
			<wfw:commentRss>http://threewaybuilders.com/projects/north-centennial-pool-addition/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>White Bear Arena Renovation</title>
		<link>http://threewaybuilders.com/projects/white-bear-arena-renovation</link>
		<comments>http://threewaybuilders.com/projects/white-bear-arena-renovation#comments</comments>
		<pubDate>Mon, 02 Oct 2000 22:13:17 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Recreational]]></category>
		<category><![CDATA[Completed Projects]]></category>

		<guid isPermaLink="false">http://threeway.aircraftadmin.ca/?p=49</guid>
		<description><![CDATA[<table style="width: 100%;" border="0" cellpadding="0" align="left">
<tbody>
<tr>
<td width="90" align="left">Owner:</td>
<td align="left">White Bear First Nation</td>
</tr>
<tr>
<td width="90" align="left">Method:</td>
<td align="left">Design-Build</td>
</tr>
<tr>
<td width="90" align="left">Total Area:</td>
<td align="left">28,190 sq. ft. (2619 m²)</td>
</tr>
<tr>
<td width="90" align="left">Design:</td>
<td align="left">Owner's representatives, Three Way Builders Ltd., L.L. Riding Engineering</td>
</tr>
<tr>
<td width="90" align="left">Construction:</td>
<td align="left">October 2000 to January 2001</td>
</tr>
</tbody>
</table>]]></description>
			<content:encoded><![CDATA[<h5>Project Photos:</h5>

<div class="ngg-galleryoverview" id="ngg-gallery-1-49">


	
	<!-- Thumbnails -->
		
	<div id="ngg-image-20" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/white-bear-arena-renovation/whitebear01.jpg" title="New exterior pre-finished cladding was applied to all walls and roof surfaces, resulting in a structure which literally &amp;quot;looks like new.&amp;quot;" class="thickbox" rel="set_1" >
								<img title="White Bear Arena Renovation" alt="White Bear Arena Renovation" src="http://threewaybuilders.com/wp-content/gallery/white-bear-arena-renovation/thumbs/thumbs_whitebear01.jpg" width="65" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-2" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/white-bear-arena-renovation/whitebear02.jpg" title="The reconstructed viewing area has an excellent, heated view of the ice surface below." class="thickbox" rel="set_1" >
								<img title="The reconstructed viewing area has ..." alt="The reconstructed viewing area has ..." src="http://threewaybuilders.com/wp-content/gallery/white-bear-arena-renovation/thumbs/thumbs_whitebear02.jpg" width="65" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-3" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/white-bear-arena-renovation/whitebear03.jpg" title="Although the existing arena&amp;#039;s original laminated wood trusses were structurally sound, new joists were added to each existing joist for reinforcement between the trusses." class="thickbox" rel="set_1" >
								<img title="Although the existing arena&amp;#039;s original ..." alt="Although the existing arena&amp;#039;s original ..." src="http://threewaybuilders.com/wp-content/gallery/white-bear-arena-renovation/thumbs/thumbs_whitebear03.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-4" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/white-bear-arena-renovation/whitebear04.jpg" title="The raised heated viewing area is directly behind the players benches." class="thickbox" rel="set_1" >
								<img title="The raised heated viewing area is ..." alt="The raised heated viewing area is ..." src="http://threewaybuilders.com/wp-content/gallery/white-bear-arena-renovation/thumbs/thumbs_whitebear04.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 		
	<div id="ngg-image-5" class="ngg-gallery-thumbnail-box"  >
		<div class="ngg-gallery-thumbnail" >
			<a href="http://threewaybuilders.com/wp-content/gallery/white-bear-arena-renovation/whitebear05.jpg" title="After removing the existing siding." class="thickbox" rel="set_1" >
								<img title="After removing the existing siding ..." alt="After removing the existing siding ..." src="http://threewaybuilders.com/wp-content/gallery/white-bear-arena-renovation/thumbs/thumbs_whitebear05.jpg" width="66" height="50" />
							</a>
		</div>
	</div>
	
		
 	 	
	<!-- Pagination -->
 	<div class="ngg-clear"></div> 	
</div>


<h4>White Bear Arena Renovation:</h4>
<div id="attachment_53" class="wp-caption alignnone" style="width: 354px"><a title="Large Photo: White Bear Arena Renovation" href="/uncategorized/large-photo-white-bear-arena-renovation"><img class="size-full wp-image-53  " title="White Bear Arena Renovation" src="http://threewaybuilders.com/wp-content/uploads/2010/01/whitebear01.jpg" alt="" width="350" height="263" /></a><p class="wp-caption-text">New exterior pre-finished cladding was applied to all walls and roof surfaces, resulting in a structure which literally &quot;looks like new.&quot;</p></div>
<h4>Description:</h4>
<p>This renovation of the existing arena in White Bear, Saskatchewan involved several distinct challenges. The main structure&#8217;s laminated wood roof trusses were structurally sound, but all of the joists between them needed to be replaced. The worn wooden bleachers needed repairs and painting, and although the in-floor cooling pipes were serviceable, the ice plant needed reconditioning.</p>
<p>We began by gutting the public viewing areas, then completely rebuilt the arena with new framing, block-work, electrical and mechanical fixtures and new finishes. Finally, we installed new exterior pre-finished cladding on the entire building. The end result is a first-rate arena at a fraction of what a new arena would have cost.</p>
]]></content:encoded>
			<wfw:commentRss>http://threewaybuilders.com/projects/white-bear-arena-renovation/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
